Springfield Developers

Heaven 20 Heights

Status

Under Construction

Project Type

Residential

Project Area

48,600 Sq. Ft.

Commencement date

July 17, 2026

Price Range

38.3M - 141.6M

Project Description

Heaven 20 Heights is Springfield Developers’ premium high-rise residential project in Sector B, Askari 11, Lahore Cantt. Officially launched in July 2026, this 22-story, GHQ-approved building sits on a prime 12-Kanal corner plot, designed by Galleria Design with a distinctive twin-peaked architectural layout that sets it apart on the Askari 11 skyline.

As one of Springfield’s current flagship developments, Heaven 20 Heights reflects the same standard of direct oversight the company applies across every project it manages, from design coordination through construction, all under one roof. The development offers 259 units in total, with a choice of 2-bedroom, 3-bedroom, and 4-bedroom apartments alongside ultra-luxury penthouses on the topmost floors. Living spaces range from 1,530 sq. ft. up to 5,666 sq. ft., giving residents room to choose a home that actually fits their life, not just their budget. Starting prices from PKR 3.83 Crore are supported by a flexible 4 to 5 year installment plan, and the building includes 300+ covered parking spaces across two dedicated basements.

Set within a secure, gated cantonment address with 24/7 patrol access, Heaven 20 Heights offers residents both privacy and connectivity. The location places daily life within easy reach, just minutes from the Lahore Ring Road Interchange, DHA Phase 5 and 9, and Allama Iqbal International Airport. Healthcare is equally close at hand, with IMC Hospital 5 minutes away and PKLI Hospital just 8 minutes away, giving residents peace of mind alongside everyday convenience.

Beyond ease of access, the address itself carries weight. Being fully approved by the GHQ Army Housing Directorate means Heaven 20 Heights is built on Army-sanctioned land with clear legal titles, a level of security and legal certainty that’s difficult to find anywhere else in the city. For residents and investors alike, that combination of urban connectivity, gated tranquility, and verified legal standing is what makes Heaven 20 Heights more than just another high-rise, it’s a home built on certainty.

Key Details

Life at Heaven 20 Heights

Library

An in-house library offering residents a quiet space to read and unwind.

Private Cinema

A 40-seat private cinema lounge for residents to enjoy films in comfort and style.

Gymnasium

A fully equipped gym with sauna and steam rooms for a complete fitness experience.

Kids' Daycare

An in-house daycare center, giving families a safe, dedicated space for children.

Multipurpose Hall

A multi-purpose suited for community gatherings and private celebrations.

Swimming Pool

International-standard swimming pool designed for residents' everyday wellness and leisure.

Coworking Space

Dedicated coworking spaces and business meeting rooms for residents who work from home.

Rooftop Gardens

Landscaped rooftop gardens and terraces, offering residents open-air space above the city.

Location

address
Sector B, Askari 11, Lahore Cantt.
Key transport

Coast
300m

University
750m

Supermarket
500m

Park
1120m

Railway station
1750m

Airport
3158m

Bus station
450m

Bank
415m

Hospital
350m

Request more information